2006: Celebrating the Highly Commended Award for the Ballarat Gold Mine Processing Plant
30 years of passionate people and global solutions.
As Gekko Systems reflects on three decades of innovation, one milestone stands out as a defining moment in our evolution: the 2006 Highly Commended Award for Minerals Processing Plant of the Year for the processing plant installed at the Ballarat Gold Mine. This recognition marked more than an industry accolade, it signalled the emergence of a new era in gold processing, shaped by Gekko’s commitment to efficiency, modularity, and smarter resource use.

When the Ballarat Gold Mine sought a processing solution capable of delivering strong recoveries with a smaller environmental footprint, Gekko responded with a design that challenged convention. The plant integrated a robust gravity circuit, intensive leaching, and low energy comminution, creating a flowsheet that was compact, efficient, and engineered for performance.
The installation demonstrated the power of lean, modular design, a philosophy that would go on to influence Gekko’s global projects for years to come. The plant’s success reinforced the idea that smarter, more agile processing solutions could deliver both economic and environmental benefits, long before sustainability became a mainstream industry priority.
Proudly Ballarat made and Australian designed, the plant showcased the depth of technical capability within regional Victoria. It was a moment of pride for the Gekko team, a demonstration that world class innovation can be engineered locally and deployed with global impact.
The award also recognised the collaboration between Gekko and the Ballarat Gold Mine, highlighting a shared commitment to operational excellence and continuous improvement. The plant’s performance over the years has validated the strength of that partnership and the enduring value of the design.
The Ballarat plant embodied the principles that continue to guide Gekko today:
- Energy efficient, reduced water flowsheets
- Low energy comminution to reduce operating costs and environmental footprint
- Realtime data collection to support faster, more informed decision making
- Solutions that consistently improve recoveries
- A design philosophy centred on modularity, efficiency, and smarter resource use
These principles have since been applied across global projects, influencing the development of technologies such as the Python, the ILR, and Gekko’s real time data instrumentation suite.
More than two decades on, the Ballarat plant remains a powerful example of what can be achieved when engineering rigour, customer partnership, and innovative thinking come together. It stands as a milestone not only in Gekko’s history, but in the broader evolution of gold processing in Australia.
As we celebrate 30 years of passionate people and global solutions, we honour the teams, partners, and customers who helped bring this milestone to life, as well as the values that continue to shape our future.