Alphamin Resources has purchased a second IPJ2400 for tin recovery at the Bisie Tin Project in the Democratic Republic of the Congo. This is the result of excellent performance by the first IPJ installed at this site in 2018 (the pictured IPJ gravity box). The Bisie...
Classic Minerals purchase Gekko gravity module. An added attraction for Classic is that the Australian-made Gekko plant is modular and mounted on containerised elements providing for scalability and ease of modification. The plant has a 30 tonne per hour capacity and...
December 2017 saw the successful commissioning of the turnkey gravity circuit installation (gravity box) at EMR Golden Grove. The circuit was designed, installed and successfully commissioned by the Gekko technical services team in close collaboration with EMR Golden...
– Compare manual sampling against real-time sampling
– Guide you on the potential use of each
Thank you for your interest in the Gekko OLGA
Download Carbon Scout Brochure
This brochure contains information on:
– Economic gains from reducing soluble gold loss to tails
- Why an automated optimasation process increases profits
- The unique solution
Thank you for your interest in the Gekko Carbon Scout
Download The InLine Spinner brochure
This brochure contains information on:
– Applications
- Theory of Operation
- Features and Benefits
Thank you for your interest in the Gekko InLine Spinner
Download The InLine Pressure Jig brochure
This brochure contains information on:
- Background information IPJ
– Unique Design Characteristics
- Theory of Operation
- Features and Benefits
Thank you for your interest in the Gekko InLine Pressure Jig!
Download The InLine Leach Reactor brochure
This brochure contains information on:
- Product profile
- Technical Leadership
- Important Benefits
- Installation base
Thank you for your interest in the Gekko InLine Leach Reactor
Download Unique Hardware brochure
This brochure contains information on:
- InLine Leach Reactor
- G-rex Resin Column
- Gekko Electrowinning
- InLine Spinner
- InLine Pressure Jig
Thank you for your interest in the Gekko solutions
Download Gekko's Capability Statement
This capability statement contains information on:
- Why Gekko
- Our People
- Key Gekko Partnerships
- Industry Recognition
- Modular Systems
- Product Range
- Consumables
- Services
- After Sales Support
Thank you for your interest in Gekko solutions
Download Modular Coal Plants brochure
This brochure contains information on:
- Background information
– Benefits
- Gekko Coal R&D
- IPJ Models
Thank you for your interest in the Gekko Python
Download Lead Nitrate Tech Sheet
The tech sheet contains details on the following:
- EINECS No.
- Appearance
- Applications
- Purity
- Packing
- etc.
You have Successfully Subscribed!
Download SMBS Tech Sheet
The tech sheet contains details on the following:
- EINECS No.
- Appearance
- Applications
- Purity
- Packing
- etc.
You have Successfully Subscribed!
Download Copper Sulphate Tech Sheet
The tech sheet contains details on the following:
- EINECS No.
- Appearance
- Applications
- Purity
- Packing
- etc.
You have Successfully Subscribed!
Download Ferric Chloride Tech Sheet
The tech sheet contains details on the following:
- EINECS No.
- Appearance
- Applications
- Purity
- Packing
- etc.
You have Successfully Subscribed!
Download Caustic Soda Tech Sheet
The tech sheet contains details on the following:
- EINECS No.
- Appearance
- Applications
- Purity
- Packing
- etc.
You have Successfully Subscribed!
Download Caustic Soda (46% IBC) Tech Sheet
The tech sheet contains details on the following:
- EINECS No.
- Appearance
- Applications
- Purity
- Packing
- etc.
You have Successfully Subscribed!
Download Ferric Sulphate Tech Sheet
The tech sheet contains details on the following:
- EINECS No.
- Appearance
- Applications
- Purity
- Packing
- etc.
You have Successfully Subscribed!
Download Carbon Scout case study
The technical team at Gekko Systems is pleased to release further data supporting the benefits of new technology that optimises carbon management systems in gold processing facilities.
This case study contains data from the Carbon Scout at the Cowal Operation.